ENGINEERING

  • Feasibility design review
  • Basic design review
  • E&I and CP Detail design execution
  • BoQ/BoM for installation
  • Data sheet for instrument and electrical equipment
  • Vendor documentations follow up & review
  • DCS/PLC/ESD sys. integrator follow up
  • Construction Method of statements
  • Construction follow up
  • MC ,Precomm, & Comm MoS.
  • Red-mark up and As built execution                          
                                      projektirovka

PROCUREMENT

  • Vendor list preparations 
  • Vendor evaluation 
  • Procurement Plan and Schedule Implementation      
  • Material requisition preparation and follow up 
  • Technical bid evaluation 
  • Purchase orders follow up 
  • Vendor progress Inspection 
  • Shipping schedule follow up 
  • IAT FAT & final certification follow up.                              
                        procurment

CONSTRUCTION

  • Process Instrument and electrical equipment installation F&G ,Firefighting and Alarm system installation
  • DCS/PLC/ESD/Telecom/CCTV/FOC Sys. Installation
  • Process analyzer and Fast loop system installation
  • Heat Tracing and CP system installation.
  • Hook-up works
TESTING
 
  • Instrument Calibration
  • Precomm & Commissioning activity
  • Start up follow up and assistance
 
MAINTENANCE
 
  • Instrument functional calibration
  • Programmed maintenance check
  • Spare parts management